
- Project identifier
- GINOP_PLUSZ-1.2.3-21-2022-00375
- Beneficiary
- SZALU ENERGY Gyártó és Szolgáltató Kft.
- Project title
- Increasing the competitiveness of SZALU ENERGY Kft.
- Amount of funding
- HUF 66,891,328
- Funding rate
- 70%
- Actual physical completion date
- 4 March 2024
In order to increase productivity, SZALU ENERGY Kft. purchased new equipment during the implementation of the project. In connection with the development of its electrical installation activity, the company acquired one CASE CX 19C mini excavator, one CASE SR 175B skid-steer compact loader, one ORTECO Smart 950 J tracked pole driver, one Magni ES 1218 RT (4WD) personnel lift, one CAT GP15N gas-powered forklift and one Snorkel A38E electric articulated personnel lift. To improve the administration of installation work, two Lenovo ThinkPad P17 G2 notebooks, two SAMSUNG C49J890DKRXEN monitors, four Lenovo ThinkPad P15 G2 notebooks and one Samsung Galaxy TAB S8 Ultra were procured. A 16 kW air-to-water heat pump system was also installed during the development. In the course of the project, the company’s training plan was drawn up and IT and English language training was completed for four employees. As a result of the development, the company’s production activity became technologically more advanced and more efficient, which was also reflected in energy and material efficiency; the environmental impact of operations was thus reduced, contributing to long-term environmental sustainability.

- Loan programme
- Loan Programme for the Technological Modernisation of Micro, Small and Medium-sized Enterprises (GINOP-8.3.5-18/B_4)
- Repayable loan amount
- HUF 100 million
- Purpose of the loan
- Working capital financing, stock procurement.

- Loan programme
- Working capital financing, material procurement for the installation of systems promoting the use of renewable energy (GINOP-8.3.5-18/B)
- Repayable loan amount
- HUF 25 million
- Purpose of the loan
- Increasing the competitiveness of SZALU ENERGY Kft.

- Beneficiary
- SZALUENERGY Gyártó és Szolgáltató Korlátolt Felelősségű Társaság
- Project title
- Complex corporate infocommunication development at SZALU ENERGY Kft.
- Contracted funding amount
- HUF 4,790,400 (total cost: HUF 11,976,000)
- Funding rate
- 40%
- Actual completion date
- 1 April 2019
- Project identifier
- GINOP-3.2.2-8-2-4-16-2017-01074
Under the grant, a seven-module enterprise resource planning system was introduced at Szalu Energy Kft. With the help of the funding, the company’s technological background and business processes were modernised and our competitiveness improved. Thanks to the software, work processes are now collected, organised and auditable. The system provides up-to-date and accurate management information. It simplifies – and in part automates – administrative processes. The company’s position in its relevant market is strengthening, as customer service is delivered with greater efficiency, which means growing customer satisfaction.

